泳池水处理机房管道安装
一、泳池水处理机房管道安装
I. pipeline installation of pool water treatment room
机房内竖向管道、水泵、阀门等排列整齐,布局合理。
The vertical pipes, pumps, valves, etc. in the machine room are arranged in order with reasonable layout.
安装前统一规划、布局,安装时放线、定位准确,相同组件的安装位置统一,注重横平竖直。
Before installation, unified planning and layout shall be carried out. During installation, setting out and positioning shall be accurate. The installation positions of the same components shall be unified, with emphasis on horizontal and vertical.
二、砌体墙应急(疏散)指示灯嵌入安装
II. Masonry wall emergency (evacuation) indicator embedded installation
灯具紧贴墙面安装,牢固,横平竖直,观感好。
The lamps shall be installed close to the wall, firm, horizontal and vertical, with good appearance.
灯具底盒暗埋在砌体墙内,控制好标高和水平线。
The bottom box of the lamp shall be concealed in the masonry wall, and the elevation and horizontal line shall be well controlled.
三、成排开关面板安装
III. installation of row switch panel
1、砌体墙上成排线盒安装,都在同一条水平线上,间距匀称,保证后期的面板安装观感好;
1. The wire boxes on the masonry wall are installed in rows, all on the same horizontal line, with uniform spacing, to ensure a good appearance of the later panel installation;
2、成排面板个,横平竖直,整齐美观;
2. Rows of panels, horizontal and vertical, neat and beautiful;
前期的成排线盒安装,保证在同一条水平线上,间距匀称。
In the early stage, the arrangement of cable boxes shall be installed to ensure that they are on the same horizontal line with even spacing.
四、地下室管线综合
IV. basement pipeline synthesis
1、喷淋管道及桥架成排布置,整齐,美观。
1. Spray pipes and bridges are arranged in rows, neat and beautiful.
在安装专业施工前,对地下室桥架、喷淋管道,给排水管道、风管等进行综合布置并进行交底。
Before the installation of professional construction, the comprehensive layout and disclosure shall be carried out for the basement bridge, spray pipe, water supply and drainage pipe, air pipe, etc.
2、剪力墙的嵌墙式灯具在预埋阶段就提前进行底盒预埋,安装时无需破坏结构墙体。使得安装更加快速,灯具与墙体成一平面。
2. The embedded luminaire of shear wall shall be embedded in the bottom box in advance in the embedding stage, and the structural wall shall not be damaged during installation. It makes the installation faster, and the lamps and walls form a plane.
剪力墙浇筑前将灯具底盒(或模具)预埋完毕,待剪力墙拆模批荡后可以直接安装灯具。
Before the shear wall is poured, the bottom box (or mold) of the lamp shall be embedded, and the lamp can be installed directly after the shear wall is removed and approved.